The Health Clinic
Partition walls
Plastering
Tiling
Bespoke joinery
Electrical works
Complete fit-out
- Surface 150 m²
- Type Non-residential
- Date January 2026
- Design Reno Geerinck
Design and project coordination for the complete fit-out of a medical practice by the canal in Brussels. Four consultation rooms, a reception, a waiting area and a kitchen, built with plasterboard walls, ceramic tiles and bespoke furniture.
Most of the work sits in what you no longer see afterwards: sound that does not travel between the consultation rooms, and surfaces that can be cleaned daily. The works are currently under way, with opening planned for late 2026.